Customer/ Engineering contractor |
Projects/ type of rendered works |
Period |
|
JSC “Tatenergo” Kazan Heat Power Plant -2 |
Installation of steam generating unit BKZ 210/140 "on a turn-key basis" |
2001 - 2002 |
|
JSC “Tatenergo” (Nizhnekamsk HPP, Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP) |
Repair, adjustment and service of main and auxiliary equipment |
2001 - 2002 |
|
JSC “Tatenergo” (Nizhnekamsk HPP, Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP) |
Repair, adjustment and service of main and auxiliary equipment |
2002 - 2003 |
|
JSC “Tatenergo” (Nizhnekamsk HPP, Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP) |
Repair, adjustment and service of main and auxiliary equipment |
2003 - 2004 |
|
JSC “Tatenergo” (Nizhnekamsk HPP, Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP) |
Repair, adjustment and service of main and auxiliary equipment |
2003 - 2005 |
|
JSC “Tatenergo” (Nizhnekamsk HPP, Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP) |
Repair, adjustment and service of main and auxiliary equipment |
January-December 2006 |
|
JSC “Tatenergo” (Nizhnekamsk HPP, Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP) |
Repair, adjustment and service of main and auxiliary equipment |
January-December 2007 |
|
JSC “Tatenergo”
“Kazan thermal grids” |
Major overhaul of heat-conducting pipe (lagging, pipes enamel coating, repair of HCP equipment) |
November –December 2002 - January- November 2003 |
|
JSC “Tatenergo” “Kazan thermal grids” |
Corrosion-resistant metal ware coating |
July-August 2003 |
|
JSC “Tatenergo” Naberezhnye Chelny HPP |
Building and construction works for installation of frequency-adjustable drives (FAD) "VACON". Commissioning of FAD |
April 2003 – August 2004 |
|
JSC “Nizhnekamskshina” |
Major overhaul of main and auxiliary power equipment |
February –December 2002 January- November 2003 February –December 2004 January- December 2005 |
| JSC “Nizhnekamskneftehim” |
Major overhaul of main and auxiliary power equipment Installation of technological equipment and piping on Cogenerating unit GTU-75 |
January- December 2002 January- December 2003 January- November 2004 January- December 2005
January- December 2006 January- December 2007 |
| “Promsnabservice” Ltd. |
Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW |
January- December 2004-2007 |
|
LLC "Tatneft-Nizhnekamskneftehim-oil"
Republic of Tatarstan |
Valves repair, non-standard equipment manufacture, electrical equipment repair |
2003-2005 |
|
OJSC "Petrokam"
Republic of Tatarstan
Russian Federation
|
Repair of the valves, heat exchangers pump equipment and electrical equipment |
January- December 2004-2007 |
|
“Novator” Ltd.
|
Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW
|
January- December 2004
|
|
SMU-TAPS
|
Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW
|
January- December 2004
|
|
JSC “Agrostroyservis”
Dzerzhinsk, Nizhniy-Novgorod region
|
installation of two cooling towers "on a turn-key basis", including manufacturing of cooling towers metalware, building and construction works of cooling towers and process equipment
|
September- December 2004 January- May 2005
|
|
OJSC "SMP-Neftegas"
Republic of Tatarstan
|
Electrotecnhical equipment repair |
2005-2007
|
|
LLC "Nizhnekamskneftehim-Divinyl"
Republic of Tatarstan
|
Repair of the production constructions and steam pipe heat insulation
Major repair of the steam turbines |
2005-2006 |
|
JSC “Tatenergo”
|
Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW |
January- December 2005-2007 |
|
“Tatelectroset” |
Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW |
January- December 2005
|
|
OJSC "Kasanorgsyntez"
Russian Federation |
Erection and commissioning works on the site of "Butene manufacture", “Reconstruction of “Ethylene-500” plant”. Commissioning works in the site
"Ethylen productions capacities escalating".
|
2007-2008
|
|
OJSC "Gasprom Sybur"
Novokuybyshevsk
Russian Federation |
Construction and erection works. Phenol manufacture. Erection works on the partial replacement of alkylating agent in the unit PTBF
|
2007-2008
|
|
OJSC "Severstal-Avto"
Yelabuga
Russian Federation |
Erection of the process equipment, Fire Fighting System of the steel structure |
2007-2008 |
|
JSC “Gasprom” General Contractor–JSC Spetsgasremstroi |
Overhaul of the main gas pipe d. 1420 mm, «Urengoy-Center 1» |
2002 - 2003 |
|
JSC “Gasprom” General Contractor–JSC Spetsgasremstroi |
Reconstruction of electro-chemical protection system of the gas pipes corridor «Chelyabinsk - Petrovsk, Urengoy - Petrovsk, Urengoy - Novopskov» |
2002 - 2003 |
|
JSC “Gasprom” General Contractor–JSC Spetsgasremstroi
|
Reconstruction of electro-chemical protection system of the gas pipes corridor «Minibaevo-Izhevsk»
|
2003-2004
|
|
JSC “Tattransgas” |
Overhaul of stations on Almetyevsk and Shemordan Linear productive department on gas-main pipelines
|
2003 - 2004 |
|
JSC “Transnefteproduct” |
Oil-trunk pipelining Andreevka- Almetyevsk D=530 on “turn-key” bases: complex of works on the linear part, including electro-chemical protection, along high-voltage( transmission) line 10 kV |
2004 |
|
JSC “Gasprom” General Contractor–JSC Spetsgasremstroi
|
Overhaul of gas pipeline (branch from Muslumovo)
|
2004-2005 |
|
JSC “Transnefteproduct” General Contractor–JSC Uralneftegasstroi |
Oil-trunk pipelining on “turn-key” bases «Subhankulovo- Almetyevsk» |
2004 - 2005 |
|
JSC “Ryazantransnefteproduct”
|
Overhaul of oil-trunk pipeline insulating coating “Gorkiy-Novki” D=530 mm |
2004 - 2005 |
|
JSC “Ryazantransnefteproduct” |
Defect elimination on oil-trunk pipeline “Gorkiy-Novki”: Installation of fillet clutches on acting all-product line D=1020 mm
|
2004 - 2005 |
|
JSC “Tattransgas” |
Building of Indoor switchgear on compressor station(CS) “Arskaya”: reconstruction of intra-area of power supply systems and power supply systems calculation on CS
|
2004 - 2005 |
|
JSC “Tattransgas”
|
Reconstruction of ethanol pipeline «Orenburg-Kazan» D=720 mm: complex of works on reconstruction of ethanol pipeline with building of launching valve and suction of cleanout devices |
2004 |
|
JSC “Tattransgas” |
Building of automatic gas-filling station-250 «turn-key» Mamadysh |
2004
|
|
JSC “Tattransgas” |
Reconstruction of electro-chemical protection system of gas pipes « Chelyabinsk - Petrovsk, Almetyevsk -Izhevsk, Orenburg-Kazan » D=720-1420 mm
|
2003 - 2007 |
|
JSC “Transnefteproduct” General Contractor–JSC Uralneftegasstroi |
Oil-trunk pipelining on “turn-key” bases «Kstovo-Yaroslavl-Kirishi-Primorsk», division 212 - 248 km. |
2005-2006 |
|