Russian projects

Customer/ Engineering contractor

Projects/ type of rendered works

Period

JSC “Tatenergo”                                       Kazan Heat Power Plant -2

Installation of steam generating unit BKZ 210/140 "on a turn-key basis"

2001 - 2002

JSCTatenergo                              (Nizhnekamsk HPP,           Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP)

Repair, adjustment and service of main and auxiliary equipment

2001 - 2002

JSCTatenergo                              (Nizhnekamsk HPP,           Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP)

Repair, adjustment and service of main and auxiliary equipment

2002 - 2003

JSC “Tatenergo”                              (Nizhnekamsk HPP,           Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP)

Repair, adjustment and service of main and auxiliary equipment

2003 - 2004

JSC “Tatenergo”                              (Nizhnekamsk HPP,           Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP)

Repair, adjustment and service of main and auxiliary equipment

2003 - 2005

JSC “Tatenergo”                              (Nizhnekamsk HPP,           Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP)

Repair, adjustment and service of main and auxiliary equipment

January-December 2006

JSC “Tatenergo”                              (Nizhnekamsk HPP,           Naberezhnye Chelny HPP, Zainsk state district power station (SDPS), Urussu SDPS, Elabuga HPP, Nizhnekamsk HydroPP)

Repair, adjustment and service of main and auxiliary equipment

January-December 2007

JSC “Tatenergo”                                       

 Kazan thermal grids”

Major overhaul of heat-conducting pipe (lagging, pipes enamel coating, repair of HCP equipment)

November –December 2002 - January-  November 2003

JSC “Tatenergo”                                           Kazan thermal grids”

Corrosion-resistant metal ware coating

July-August  2003

JSC “Tatenergo”                                  Naberezhnye Chelny HPP

Building and construction works for installation of frequency-adjustable drives (FAD) "VACON". Commissioning of FAD

April 2003 – August 2004

JSC “Nizhnekamskshina”

 Major overhaul of main and auxiliary power equipment

February –December 2002 January-  November 2003 February –December 2004 January- December 2005

JSC “Nizhnekamskneftehim”

Major overhaul of main and auxiliary power equipment

Installation of technological equipment and piping on Cogenerating unit GTU-75

January-  December 2002 January-  December 2003 January-  November 2004 January- December 2005

January- December 2006

January- December 2007
“Promsnabservice” Ltd. Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW January-  December 2004-2007

LLC "Tatneft-Nizhnekamskneftehim-oil"

Republic of Tatarstan

Valves repair, non-standard equipment manufacture, electrical equipment repair 2003-2005

OJSC  "Petrokam"

Republic of Tatarstan

Russian Federation

 

Repair of the valves, heat exchangers pump equipment and electrical equipment

January-  December 2004-2007

“Novator” Ltd.

 

 

Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW

 

January-  December 2004

 

SMU-TAPS

 

 

Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW

 

January-  December 2004

 

JSC “Agrostroyservis”

Dzerzhinsk, Nizhniy-Novgorod region

 

installation of two cooling towers "on a turn-key basis", including manufacturing of cooling towers metalware, building and construction works of cooling towers and process equipment

 

September-  December 2004 January- May 2005

 

OJSC  "SMP-Neftegas"

Republic of Tatarstan

 

Electrotecnhical equipment repair

2005-2007

 

LLC "Nizhnekamskneftehim-Divinyl"

Republic of Tatarstan

 

Repair of the production constructions and steam pipe heat insulation

Major repair of the steam turbines

2005-2006

JSC “Tatenergo”

 

Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW

January-  December 2005-2007

“Tatelectroset”

Building, reconstruction and overhaul of VL 0.4-10 KW, TP, RP, overhaul of VL 35-110 KW

January-  December 2005

 

 

OJSC "Kasanorgsyntez"

Russian Federation 

Erection and commissioning works on the site of "Butene manufacture", “Reconstruction of “Ethylene-500” plant”. Commissioning works in the site

 "Ethylen productions capacities escalating".

 

2007-2008

 

OJSC "Gasprom Sybur"

Novokuybyshevsk

Russian Federation 

Construction and erection works. Phenol manufacture. Erection works on the partial replacement of alkylating agent in the unit PTBF

 

2007-2008

 

OJSC "Severstal-Avto"

Yelabuga

Russian Federation 

Erection of the process equipment, Fire Fighting System of the steel structure

2007-2008

JSC “Gasprom”                                      General Contractor–JSC Spetsgasremstroi 

Overhaul of the main gas pipe d. 1420 mm, «Urengoy-Center 1»

2002 - 2003

JSC “Gasprom”                                      General Contractor–JSC Spetsgasremstroi

Reconstruction of electro-chemical protection system of the gas pipes corridor «Chelyabinsk - Petrovsk, Urengoy - Petrovsk, Urengoy - Novopskov»

2002 - 2003

JSC “Gasprom”                                      General Contractor–JSC Spetsgasremstroi

 

Reconstruction of electro-chemical protection system of the gas pipes corridor «Minibaevo-Izhevsk»

 

2003-2004

 

JSC “Tattransgas”

Overhaul of stations on Almetyevsk and Shemordan Linear productive department on gas-main pipelines

 

2003 - 2004

JSC “Transnefteproduct”

 Oil-trunk pipelining Andreevka- Almetyevsk D=530 on “turn-key” bases: complex of works on the linear part, including electro-chemical protection, along high-voltage( transmission) line 10 kV

2004

JSC “Gasprom”                                      General Contractor–JSC Spetsgasremstroi

 

Overhaul of gas pipeline (branch from Muslumovo)

 

2004-2005

JSC “Transnefteproduct”                          General Contractor–JSC Uralneftegasstroi

Oil-trunk pipelining on “turn-key” bases «Subhankulovo- Almetyevsk»

2004 - 2005

JSC “Ryazantransnefteproduct”

Overhaul of oil-trunk pipeline insulating coating “Gorkiy-Novki” D=530 mm

2004 - 2005

JSC “Ryazantransnefteproduct”

Defect elimination on oil-trunk pipeline “Gorkiy-Novki”:
Installation of fillet clutches on acting all-product line D=1020 mm

 

2004 - 2005

 JSC “Tattransgas”

Building of Indoor switchgear on compressor station(CS) “Arskaya”: reconstruction of intra-area of power supply systems and power supply systems calculation on CS

 

2004 - 2005

JSC “Tattransgas”

 

Reconstruction of ethanol pipeline «Orenburg-Kazan» D=720 mm: complex of works on reconstruction of ethanol pipeline with building of launching valve and suction of cleanout devices

2004

JSC “Tattransgas”

Building of automatic gas-filling station-250 «turn-key» Mamadysh

2004

 

 JSC “Tattransgas”

Reconstruction of electro-chemical protection system of gas pipes « Chelyabinsk - Petrovsk, Almetyevsk -Izhevsk, Orenburg-Kazan » D=720-1420 mm

 

2003 - 2007

JSC “Transnefteproduct”                          General Contractor–JSC Uralneftegasstroi

Oil-trunk pipelining on “turn-key” bases «Kstovo-Yaroslavl-Kirishi-Primorsk», division 212 - 248 km.

2005-2006